Pretty long list this weekend, mostly driven by getting a heat pump installed 2 weeks ago:
Re-layed some loft boards which got taken up
Relayed a load of insulation
General tidy up in the loft
Rebuilt the shelving in the airing cupboard, fitting it around the new cylinder and pipework.
Filled sanded and repainted around new radiator pipework on 7 rads, typically all rooms were a different colour and I only used the wrong paint once
Touched in a load of other paint bashes/scrapes while I was there.
I wrapped up the weekend with building 2 book cases